Re: Proposal for reducing Subversion's lengthy (and unpredictable) release cycles.

From: Andy Singleton <andy_at_assembla.com>
Date: Mon, 17 Jun 2013 12:34:04 -0400

  On 6/17/2013 11:36 AM, Daniel Shahaf wrote:
> C. Michael Pilato wrote on Mon, Jun 17, 2013 at 11:24:45 -0400:
>> On 06/17/2013 09:57 AM, Daniel Shahaf wrote:
>>> On Mon, Jun 17, 2013 at 09:36:29AM -0400, C. Michael Pilato wrote:
>>>> On 06/13/2013 10:30 PM, Greg Stein wrote:
>>>>> Fair enough. But I think you're talking about Step Two. There is more
>>>>> work on what "stable" means, what time schedules to use, etc. That's
>>>>> Step One.
>>>> In private mail, you also asked for tighter definition of the various
>>>> trimesters of stability (which is an interesting choice of terminology in my
>>>> own personal life right now, but I digress...). Here's my thinking:
>>>>
>>>> Tri 1: Trunk builds and passes tests, but may have crazy new,
>>>> sweeping-change types of features on it. We've tried to be
>>>> forward-thinking, but who knows if these are the APIs/protocols/etc. that
>>>> we'll wind up with in the release. At the end of this period, we might say
>>>> we're merely "build stable". We could ship an alpha at the end of this
>>>> period to get the crazy new features into the public's hands for user
>>>> acceptance testing.
>>>>
>>> I like the idea of sprinkling alpha/beta releases along the way.
>>>
>>>> Tri 2: Trunk builds and passes tests, and the crazy stuff is still getting
>>>> hammered into release-worthiness, but we're not allowing any more crazy
>>>> stuff in. Smallish features and enhancements are fine, but nothing like a
>>>> WC-NG or Ev2 or FS-NG or.... At the end of this period, we would say we're
>>>> "feature stable", and could ship a beta release.
>>>>
>>>> Tri 3: Trunk is feature-complete. Oh, and it builds and passes tests. :-)
>>>> We're serious about getting this thing ready to release, now. Strictly
>>>> speaking, this "period" of trunk's life extends until the final release is
>>>> cut by taking the "release branch" side of the fork in the road. But we
>>>> don't want to lock down the trunk indefinitely, so we get as much
>>>> stabilization done on the trunk as we can before branching for release
>>>> stabilization and reopening the trunk for a new "first trimester".
>>> Which trimester is concurrent to the "1.N.x branched, but 1.N.0 not released
>>> yet" period?
>> That was a point we didn't fully settle on in Berlin. Today that period is
>> a limbo of sorts. Trunk is technically open to anything, but we don't like
>> to codebomb it because it complicates backports of stabilization fixes to
>> the release branch.
>>
>> I suggest that it should instead be the first trimester of the new release
>> cycle -- and as such, wide open to changes -- because if all goes as
>> planned, there will be fewer things to backport anyway (since we will have
>> already been sitting in a feature-frozen stabilization mode on the trunk for
>> three months prior.)
>>
>> Other ideas?
> How about: at the end of the third trimester, the release branch is
> created, a release candidate is cut, and the 1st trimester begins on
> trunk?
>
> I.e., make all of those simultaneous. Trunk will be in Tri1 mode while
> the release branch is in soak, so we won't have the problem of needing
> to pay attention to two active branches. That's also consistent with
> doing alpha at the end of tri1 and beta at the end of tri2.

Did you consider a process that produces a release every month, or every
quarter? If any engineering team can do it, the Apache Subversion team
can do it. There is some discipline around code review and a long
history of automated testing.

I like the trimester plan. However, in my experience, when you get into
a situation where it takes longer and longer to test and release a piece
of software, it's hard to reverse. The system is becoming more complex,
it has more pieces and use cases, and it naturally takes longer to test
it. Is it possible that this dynamic is at work with Subversion, and
that the trimester plan has a high probability of falling into a
situation where the third trimester takes substantially longer than one
trimester?

One reliable way to fix the problem is to move the development to
continuous delivery and force testing much earlier in the process. It
might end up being less work.

You could argue that Subversion is a difficult case for continuous
delivery because it requires compatible upgrades to both client and
server. Yes, this is a difficult problem. However, Subversion is already
dealing with this problem. There is an implicit requirement that new
server releases be compatible with older clients. Increasing the release
frequency does not increase the difficulty of dealing with this requirement.

You can also argue that Subversion is a difficult case because it isn't
just adding features. The team is making deep structural reforms that
can't be finished in a month, and aren't backwards compatible. This is a
problem that is faced by every continuous delivery team. They often
release two separate versions of a major subsystem in one piece of
software, with one subsystem switched for most users off until it is
ready. This requires some extra engineering work during the transition
period. However, you get back a lot of the extra work when you go to do
testing and deployment, because the new subsystem is already deployed
and mostly tested.

The team would be relying on some standard tactics of continuous
development teams.
* Feature switches. Major changes are hidden with "IF FEATURE_IS_ON".
This is standard practice and it's used in Subversion now. It doesn't
create code clutter if you remove the switches later.
* Code review
* Automated tests
* Beta testers. People would need to make a commitment. We would run the
newest version on some of our servers.

You would probably want to add automated error reporting from the new
clients and servers. That reporting can serve as a substitute for
complete automated regression testing and reduces the investment in
building automated tests.

I believe that you would also want to think about the possibility that a
release would not come from trunk. Maybe a smaller group of contributors
can prepare something for release on a branch. In the very centralized
development process that I see, the core maintainers are taking a lot of
pressure in the ramp up to a release. This could be distributed.

It's just an idea. It works for us.

-- 
Andy Singleton
Founder/CEO, Assembla Online: http://www.assembla.com
Phone: 781-328-2241
Skype: andysingleton
Received on 2013-06-17 18:34:56 CEST