"Hyrum K. Wright" <hyrum_wright_at_mail.utexas.edu> writes:
> The current plan is to branch Nov. 5, this Wednesday, two days away. I'm
> currently not very optimistic that we are going to make that date, for the
> following reasons:
>
> * Loads of stuff in TODO-1.6
> * Buildbot lit up like a Christmas tree (I can reproduce the 8 failing tests
> locally, too.)
> * A large number of XFAIL tests on trunk, mostly merge tests.
> * A general feeling that despite our best efforts, another week may be needed.
>
> I'm not heavily involved in much of the above (though I do plan on looking at
> the FSFS problems in TODO-1.6), so I can't comment on whether they are minor
> issues or will need extra time. As mentioned before, I'm willing to push back
> the branch date a bit, but I feel a bit uneasy about going beyond Nov. 12.
>
> Thoughts?
I think Nov. 12th would be great. I don't know about other U.S. devs,
but the election has certainly been a factor for me this week (was out
in Pennsylvania doing Obama canvassing, for example).
The issue-2843-dev branch merge has been going okay. When I saw a bunch
of test failures on the branch, after bringing it up-to-date with trunk,
I worried it might be really broken. But now that I'm testing trunk I
think those test failures are probably actually from trunk, not the
branch. How, um, reassuring :-).
-Karl
---------------------------------------------------------------------